ONGOING WORKS
Progress Update
27%
Altea and Benissa Front View
Altea and Benissa Side View
Altea and Benissa Concrete and Rebar Works
Other Progress Photos of Altea and Benissa
Civil works
Soil / Excavation Works
Completed
Completed
Civil / Structural / Architectural Works
Ongoing installation of columns and shear walls at 11/F Tower A
Ongoing installation of columns and shear walls at 11/F Tower A
Electrical Works
Ongoing completion of piping and box setting at 5/F
Ongoing completion of piping and box setting at 5/F
Mechanical Works
Ongoing installation of vertical ducting at 6/F-7/F
Ongoing installation of vertical ducting at 6/F-7/F
Plumbing/Sanitary Works
Ongoing installation of branchline at 6/F
Ongoing installation of branchline at 6/F
Fire Protection Works
Ongoing installation of crossmain at 5/F
Ongoing installation of crossmain at 5/F
As of December 2023
Installed proppings at Area 1
Installed Rock Anchors in Area 4 Ramp Access
Excavation works
Soil protection works and bulk excavation
- Ongoing soil protection and bulk excavation works
As of June 2022
Excavation works
Soil protection works and bulk excavation
- Backfilling Works and Driven casing for equipment platform and equipment access at Tower A and B side.
- Construction of guidewall2nd layer at excavated area
As of April 2021
Excavation works
Soil protection works and bulk excavation
As of December 20, 2020